Bayside Water and Wastewater Improvements
Panama City Beach, Florida (Construction in Progress)
The purpose of the Bayside water and wastewater project was to replace the entire subdivision water distribution and sewer collection system. This project consisted of the installation of approximately 10,815 linear feet of 10-inch PVC water main, 21 fire hydrants, 328 new 1-inch service lines, 9,115 linear feet of 8-inch gravity sewer main, 44 gravity sewer manholes, 295 new 4-inch sewer laterals, 40 linear feet of 2” force main, 1,360 linear feet of 4” force main, 1,405 linear feet of 6” force main, and 2 wastewater pump stations and all appurtenances. The Anchor team was responsible for EEO/Compliance, inspection and construction administration for the Construction Engineering and Inspection (CEI) portion of the project.

St. Augustine Road Resurfacing CEI
Jefferson County, FL
This project consisted of resurfacing St. Augustine Road in Jefferson County. The existing asphalt road was approximately 2.23 miles in length and, in addition to the resurfacing, also included minor drainage work and new striping. The ACEI team assisted with construction administration and inspection services throughout the construction duration.